Skip to content
English
  • There are no suggestions because the search field is empty.

HD580Max ESC Assembly 2

Product Name

HD580Max

Workstation

ESC Assembly 2

 

Materials

Name Part number Number Description

HD5150 ESC MOS-side Thermal Pad 2

201-002513 2

 

HD5150 ESC Bottom Housing

201-002410 1

 

HD5150 ESC MOS-side Thermal Pad 4

201-002515 1

 

HD5150 ESC MOS-side Thermal Pad 3

201-002514 1

 

M5 waterproof and breathable valve 128-000399 1

 

HD5150 ESC MOS-side Thermal Pad 1

201-002512 1 Alternative material: HD5150 electric adjustment copper strip surface thermal pad 201-002417

M3 × 10 mm 304 Stainless Steel Low-Profile Socket Head Cap Screw

126-001003 6

 

Kafuter K-704BL Silicone Sealant

131-000069

 

 

 

Work Instructions

Step 1 Attach thermal pads 2 & 3 & 4 according to the illustrated position.
Use tools & fixtures 1. ESC assembly fixture
Operational special requirements 1. Thermal pad without leakage
2. Thermal pad without floating or damage

Step 2 Attach the thermal pad 1 as shown in the figure.
Use tools & fixtures 1. ESC assembly fixture
Operational special requirements 1. Thermal pad without leakage
2. Thermal pad without floating or damage

Step 3 Lock the upper and lower shells with 6 M3 * 10_304 stainless steel thin head hexagonal machine tooth screws, torque: 0.6 ± 0.06NM, and then lock 1 breathable valve, torque: 0.4 ± 0.04NM
Use tools & fixtures 1. Electric Screwdriver
2. Torque calibrator
3. Electric adjustment assembly fixture
Operational special requirements 1. No abnormal locking of the screwdriver
2. No leakage locking of the screwdriver
3. No abnormal torque

Step 4 Use 704BL glue to insert into the groove of the upper and lower shells and implement curing
Use tools & fixtures

 

Operational special requirements 1. Glue without leakage
2. Glue without overflow
3. There is no visual gap between the glue and the shell after it is injected

General requirements
1. Operators must wear anti-static wrists and finger covers or gloves
2. The workbench should always be kept clean and tidy
3. If you find three similar abnormalities, please report to the production line administrator immediately
4. Label the defective parts and place them in the designated defective product placement box