HD580Max ESC HC302B ESC P2 PCBA

Product name:

ESC main board _HC302B_ESC_P2_PCBA

Part number:

135-000696

Project name:

5150

Date: 2025/06/03

Station Number

Workstation

Operation Description

Process Serial Number

Production Equipment/Tools

Number

Unit Price of Fixture

Production Beat

100

Incoming inspection IQC

Inspection of incoming electronic components

1

LCR measuring equipment

1

SMD factory self-provided

The patch factory evaluates based on its own equipment and wire configuration

200

B-side solder paste printing

The solder paste is printed onto the PCB through a steel mesh and printing press

2

Steel mesh/solder paste printing machine/support base

1

SMD factory self-provided Steel mesh/support base, patch factory according to Gerber's own procurement

The patch factory evaluates based on its own equipment and wire configuration

300

Side B SPI inspection

Inspection of the printing quality of solder paste Automatic inspection of solder paste offset DX, DY, solder paste volume, area, height is required

3

SPI equipment (3D best)

1

SMD factory self-provided

The patch factory evaluates based on its own equipment and wire configuration

400

B surface patch

Attach electronic components to the PCB printed with solder paste

4

Mounter (CMK greater than 2.0)

1

SMD factory self-provided

The patch factory evaluates based on its own equipment and wire configuration

500

B-side solder paste reflux

Electronic components are soldered on the PCB by high-temperature reflow soldering The furnace temperature needs to be monitored Control the Reflow Profile according to the Paste Spec.

5

Reflux furnace (preferably with N2 function)

1

SMD factory self-provided

The patch factory evaluates based on its own equipment and wire configuration

600

B side AOI

Inspection of welding quality Inspection standard IPC-610 class3

6

Automatic optical inspection equipment (3D best)

1

SMD factory self-provided

The patch factory evaluates based on its own equipment and wire configuration

700

T-side solder paste printing

The solder paste is printed onto the PCB through a steel mesh and printing press

7

Steel mesh/solder paste printing machine/support base

1

SMD factory self-provided Steel mesh/support base, patch factory according to Gerber's own procurement

The patch factory evaluates based on its own equipment and wire configuration

800

T-surface SPI inspection

Inspection of the printing quality of solder paste It is necessary to check the offset DX, DY, volume, area, and height of the solder paste

8

SPI equipment (3D best)

1

SMD factory self-provided

The patch factory evaluates based on its own equipment and wire configuration

900

T surface patch

Attach electronic components to the PCB printed with solder paste

9

Mounter (CMK greater than 2.0)

1

SMD factory self-provided

The patch factory evaluates based on its own equipment and wire configuration

1000

T-side solder paste reflux

Electronic components are soldered on the PCB by high-temperature reflow soldering The furnace temperature needs to be monitored Control the Reflow Profile according to the Paste Spec.

10

Reflux furnace (preferably with N2 function)

1

SMD factory self-provided

The patch factory evaluates based on its own equipment and wire configuration

1100

T-side AOI

Inspection of welding quality Inspection standard IPC-610 class3

11

Automatic optical inspection equipment (3D best)

1

SMD factory self-provided

The patch factory evaluates based on its own equipment and wire configuration

1200

Wave soldering

Soldering of hand-inserted components

12

Wave soldering furnace/wave soldering vehicle

1

SMD factory self-provided Wave soldering vehicle patch factory purchases according to GERBER

The patch factory evaluates based on its own equipment and wire configuration

1300

Split board

Convert panel PCBA to single PCS

13

Automatic splitting machine (milling cutter method)/splitting fixture

1

SMD factory self-provided

The patch factory evaluates based on its own equipment and wire configuration

1400

Assembly

Welding temperature measurement line (hand welding)

14

Soldering iron/assembly fixture

1

XAG provides work instructions SMD factory self-provided The loading plate placement factory purchases according to the gerber and equipment itself

60S/pcs

1500

MCU burning

Burning low-level driver software

15

Burning fixture

1

Fixture/software provided by XAG

15S/pcs

1600

Single board test

Functional testing

16

Test fixture

1

Fixture/software provided by XAG Special requirements: The chip factory needs to configure a large power supply and load You can rent it for an estimated 6000RMB/month.

60s/pcs

1700

Apply three-proof paint

Apply three-proof paint in the designated area as required

17

Three-proof equipment/painting tray

1

SMD factory self-provided The loading plate placement factory purchases according to the gerber and equipment itself

The patch factory evaluates based on its own equipment and wire configuration XAG provides relevant information

1800

Point glue

Reinforcing plug-in element

18

Dispensing machine & dispensing carrier board

1

XAG provides work instructions

The patch factory evaluates based on its own equipment and wire configuration XAG provides relevant information

1900

Inspection QOC

Inspection shipment

19

NA

1

NA

The patch factory evaluates based on its own equipment and wire configuration XAG provides relevant information

 

Patch requirements: 1. PTH component through hole tin rate > 90%, no bridge at the bottom of the part, no floating part, tilt 2. J1, J3, J4, J5, J8 structural parts need to be tin-filled and can use SMT process Capacitor plates are not allowed to float or tilt. After welding, black glue needs to be inserted between the capacitor on the capacitor plate and the ESC plate. Please refer to the ""HC302B ESC dispensing diagram"" for details. 3. The height of the PTH part pin exposed to the board surface is 0.5~ 1.5mm. If it exceeds 1.5mm, it needs to be trimmed 4. All I-shaped TP points need to be expanded with steel mesh to cover the screen printing frame area with a full amount of tin 5. Sub-board point, the distance between the protruding board edge is required to be ≤ 0.1mm.

 

Manual Soldering Specifications
Step 1

Solder the two ends of the temperature sensor wire to the corresponding PCBA solder pads (TP17 & TP18).

Attach the other end to the left pin position of the IOS (Q11).

First cover it with UV curing adhesive, then apply UV curing agent.

Use tools & fixtures

1. Electric soldering iron

2. Temperature meter

3. Hot air gun

4. Lead-free solder wire

Operational special requirements

Soldering conditions:

  • Temperature: 350 °C ±10 °C
  • Soldering time: 1–3 seconds
  • Ensure full solder joints with no cold solder, false solder, or solder bridges.

The wire end at IOS must be tightly attached to the space position.

 

Coating Specifications

Instructions

  1. Areas inside the red boxes are coating areas.
  2. Areas inside the black boxes are prohibited coating areas (screws & connectors).
  3. Priority: ensure prohibited areas are completely avoided.

 

Adhesive Application

Instructions

Apply adhesive within the red-bordered areas. The adhesive must cover:

  1. The connection between the component leads and the component body.
  2. The area between the component body and the PCB.
  3. The area between the component leads and the PCB. Warning: Adhesive must not overflow past the edge of the board or cover any mounting screw holes.