Skip to content
English
  • There are no suggestions because the search field is empty.

HD580Max Flight Controller Assembly 1

Product Name

HD580Max

Workstation

Flight Controller Assembly 1

 

Materials

Name Part number Number Description
Avionics board 135-000677 1

 

HD5150 avionics module wiring harness 108-000561 1

 

HD580_ antenna adapter 129-000337 1

 

HD580 GPS positioning antenna adapter cable 129-000338 1

 

M3×10mm Pan-Head Phillips Machine Screw

126-000505 8

 

M2.5*L6 machine screws 126-000202 6

 

HC403_ avionics module lower cover 201-002507 1

 

Kraft glue 704BL 131-000069

 

 

HC403 Avionics Thermal pad 1 128-000926 1

 

HC403 Avionics Thermal pad 2 128-000927 1

 

HC403 Avionics Thermal pad 3 128-000928 1

 

HC403 Avionics Thermal pad 4 128-000929 1

 

Avionics Thermal pad 4 128-000358 2

 

Avionics V2 Thermal pad 3 128-000617 2

 

Avionics V2 Thermal pad 5 128-000688 1

 

 

Work Instructions

Step 1 Insert the four-in-one wire harness, data transmission antenna adapter cable, and spiral positioning antenna adapter cable into the lower cover according to their respective anti-stupidity boss positions, and lock a total of 8 M3 * 10 round-headed cross mechanical tooth screws, torque: 0.5 ± 0.05NM
Use tools & fixtures 1. Electric Screwdriver
2. Torque Calibrator
3. Bottom Shell Wire Harness Assembly Fixture
Operational special requirements 1. No abnormalities in the installation position
2. No leakage lock for the bolt
3. No abnormalities in the bolt lock
4. No abnormalities in the torque calibration

Step 2 Use 704BL glue to point glue in three wire grooves, and then attach various heat dissipation pads to the specified positions
Use tools & fixtures 1. Assembly fixture
Operational special requirements 1. No leakage of the heat dissipation pad
2. No damage or floating of the heat dissipation pad
3. No leakage of the glue and fill the wire groove
4. The glue does not overflow, interfering with the waterproof rubber ring and PCBA installation

Step 3 Put the avionics main board into the lower shell according to the diagonal positioning column position, lock a total of 6 M2.5 * L6 mechanism bolts, torque: 0.5 ± 0.05NM
Use tools & fixtures 1. Electric Screwdriver
2. Torque Calibrator
3. Assembly Fixture
Operational special requirements 1. No abnormalities in the installation position
2. No leakage lock for the screwdriver
3. No abnormalities in the screwdriver lock
4. No abnormalities in the torque calibration
5. Check and mark the screwdriver after the lock is completed

Step 4 Remove the card line adhesive and stick it tightly to the designated pad position on the main board, insert the antenna on the right into the line card, and finally insert the other antennas and each wire harness connector into the designated position in the anti-fool direction, and then attach a avionics V2 heat dissipation silicone pad 3 to the middle of the designated exposed copper area on the board
Use tools & fixtures 1. Assembly fixture
Operational special requirements 1. Connector direction is normal
2. Connected in place
3. Wire card is not missing
4. Heat dissipation pad is not missing
5. Heat dissipation pad is not damaged or floating

General requirements
1. Operators must wear anti-static wrists and finger covers or gloves
2. The workbench should always be kept clean and tidy
3. If you find three similar abnormalities, please report to the production line administrator immediately
4. Label the unqualified parts and place them in the designated defective product placement box