Skip to content
English
  • There are no suggestions because the search field is empty.

HD580Max Flight Controller Assembly 2

Product Name

HD580Max

Workstation

Flight Controller Assembly 2

 

Materials

Name Part number Number Description

M2.5 × 15 mm + 6 mm Hex Standoff

126-000412 4

 

M2.5 × 6mm Pan-Head Phillips Machine Screw 126-000202 3

 

Power board 135-000488 1

 

M2.5 × 8mm Pan-Head Phillips Stainless Steel Machine Screw

126-000334 4

 

HD540S Avionics Wi-Fi Antenna 129-000254 1 Alternative: HD540S_ avionics WiFi antenna 129-000322
K-1668 Kafuter Adhesive 131-000015

 

Yellow gum
HC403 Avionics Housing Waterproof Gasket 201-002509 1

 

 

Work Instructions

Step 1 Lock 4 M2.5 * 15 + 6 hexagonal copper columns to the main board, torque: 0.4 ± 0.04NM
Use tools & fixtures 1. Electric Torque Screwdriver
2. Torque Calibrator
3. Assembly Fixture
Operational special requirements 1. Installation position without abnormalities
2. Stud without leakage lock
3. Stud lock without abnormalities
4. Torque calibration without abnormalities

Step 2 Confirm that the main board connector pin is not broken or tilted, insert the power board in the matching position, and lock 3 M2.5 * L6 mechanism bolts, torque: 0.4 ± 0.04NM
Use tools & fixtures 1. Electric Screwdriver
2. Torque Calibrator
3. Assembly Fixture
Operational special requirements 1. Pin needle without abnormalities
2. No leakage lock
3. No abnormalities in the lock
4. No abnormalities in torque calibration
5. Lock the completed screw, Check and mark

Step 3 Remove the adhesive of the wifi antenna, stick it tightly to the wifi bracket in the specified direction, then place the bracket on the power board according to the positioning hole position, lock 4 M2.5 * 8 mechanism stainless steel drop-resistant screws, torque: 0.3 ± 0.03NM
Use tools & fixtures 1. Electric Screwdriver
2. Torque Calibrator
3. Assembly Fixture
Operational special requirements 1. Screen without leakage lock
2. Screen lock without abnormality
3. Torque calibration without abnormality
4. Check and mark the completed bolt after locking

Step 4 Insert the wifi antenna into the designated terminal, and insert the wifi antenna into the card slot of the power board, and apply yellow glue to the other connector positions on the board. Install the waterproof silicone ring according to the shape position
Use tools & fixtures

 

Operational special requirements 1. Yellow glue without leakage points
2. Yellow glue covers the connector and the base on the board
3. The rubber ring does not float, break, or leak

General requirements
1. Operators must wear anti-static wrists and finger covers or gloves
2. The workbench should always be kept clean and tidy
3. If you find three similar abnormalities, please report to the production line administrator immediately
4. Label the defective parts and place them in the designated defective product placement box