P2: Flight Platform Assembly 2
|
Product Name |
C31 Flight Platform |
|
Workstation |
Flight Platform Assembly 2 |
Materials
| Name | Part number | Number | Description |
| HD5150 machine head line card right pressure plate | 201-002430 | 1 |
|
| M4 * 10_ stainless steel flange inner hexagon machine tooth bolt _ whole circle resistant to falling | 126-000955 | 2 |
|
| HD5150 Cylinder Distribution Board Module Assembly | 754-000051 | 1 |
|
| HD5150_ battery communication power supply harness | 108-000585 | 1 |
|
| M4 * 12_ stainless steel flange inner hexagon machine tooth bolt _ whole circle resistant to falling | 126-000922 | 10 |
|
| HD5150 Cylinder Divider Plug | 201-002740 | 4 |
|
| HD5150_ rear radar adapter | 108-000572 | 1 |
|
| HD5150_ Load Control Adapter Cable | 108-000571 | 1 |
|
| HD5150 Arm Power Connector Safety Buckle | 201-002776 | 8 |
|
Work Instructions
| Step 1 | 1. The four power harnesses in the four arms are threaded through the frame from the middle through hole, and the two electric signal wires (1 to 2) and two image transmission antennas are threaded through the front side of the frame. Then, the battery communication power supply harness is inserted into the designated position of the interface board in the anti-stupidity direction, and the load power adapter harness of the distribution board is threaded through the frame from both front sides and threaded out from the middle through hole |
| Use tools & fixtures | 1. Flight platform carrier board |
| Operational special requirements | 1. The connector is inserted into place. 2. The wire harnesses are not coiled when threading |

| Step 2 | 1. Insert the 8 power lines into the 8 corresponding anti-fool connectors (white to white, black to black) of the distribution board component according to the color corresponding state, and insert the 8 connector safety buckles. Insert the battery communication power supply harness and load power supply adapter harness into the corresponding anti-fool connectors at the designated position nearby |
| Use tools & fixtures | 1. Flight platform carrier board |
| Operational special requirements | 1. The connector is inserted in place 2. The wiring harness is not coiled with each other 3. Pay attention to the installation direction of the distribution board component |

| Step 3 | After burying all wire harnesses in the wire bin, lock the splitter board assembly with 10 M4 * 12_ stainless steel flange hexagonal machine tooth screws and the wire bin, torque: 1.5 ± 0.15NM, and then plug in 4 screwdrivers |
| Use tools & fixtures | 1. Electric Batch 2. Torque Calibrator 3. Flight Platform Carrier Board |
| Operational special requirements | 1. No abnormal locking of the screwdriver 2. No leakage of the screwdriver 3. No abnormal torque 4. No abnormal installation direction 5. No leakage of the screwdriver plug |

| Step 4 | Insert the load control adapter cable and the rear radar adapter cable in the anti-fool direction, and then insert a load power adapter harness from the distribution board into the right line card of the head in order, and use 2 M4 * 10_ stainless steel flange hexagonal machine tooth screws to lock the head line card on the right pressure plate, torque: 1.5 ± 0.15NM |
| Use tools & fixtures | 1. Electric Batch 2. Torque Calibrator 3. Flight Platform Carrier Board |
| Operational special requirements | 1. No abnormal locking of the screwdriver 2. No leakage locking of the screwdriver 3. No abnormal torque 4. No abnormal installation direction |

| General requirements |
| 1. Operators must wear anti-static wrists and finger covers or gloves |
| 2. The workbench should always be kept clean and tidy |
| 3. If you find three similar abnormalities, please report to the production line administrator immediately |
| 4. Label the defective parts and place them in the designated defective product placement box |