P3: Flight Platform Assembly 3
|
Product Name |
C31 Flight Platform |
|
Workstation |
Flight Platform Assembly 3 |
Materials
| Name | Part number | Number | Description |
| M3 * 15_ stainless steel flange inner hexagon machine tooth bolt _ whole circle resistant to falling | 126-000744 | 30 | Version without LiDAR: Number 28 |
| 5180 Tail Joint Threading Cover | 201-002915 | 2 |
|
| M4 * 10_ stainless steel flange inner hexagon machine tooth bolt _ whole circle resistant to falling | 126-000955 | 4 |
|
| 2 + 10 pin connector plug, black | 120-000133 | 1 | Lidar-free version |
Work Instructions
| Route diagram | Insert the rotating radar wire harness into the connector from the upper side according to the direction shown in the figure. Pay attention to wiring the antennas on both sides on the inside of the electric control wire harness. For the non-LiDAR version, use the 2 + 10pin connector plug to plug into the LiDAR interface of the interface board without locking the screws |

| Step 1 | After inserting the avionics, electronic signal lines, radar, front camera and other wire harness connectors into the interface board at the designated position, a total of 30 M3 * 15_ stainless steel flange hexagonal machine tooth screws are locked, torque: 0.8 ± 0.08NM, the electronic signal harness and communication harness, load power harness are clamped into the two side wire clips according to the diameter, position, and natural state |
| Use tools & fixtures | 1. Electric Batch 2. Torque Calibrator 3. Flight Platform Carrier Board |
| Operational special requirements | 1. No abnormal locking of the screwdriver 2. No leakage locking of the screwdriver 3. No abnormal torque 4. No abnormal installation direction 5. No mutual winding of the wire harness |

| Step 2 | After connecting the RTK antenna and the image transmission antenna separately, point the yellow glue at the connection of the image transmission antenna, and then place the connector in the middle of the bottom line card according to the specified position, and insert the antenna |
| Use tools & fixtures | 1. Flight platform carrier board |
| Operational special requirements | 1. Connect and connect in place 2. Click in according to the specified position 3. Yellow glue without leakage |

| Step 3 | Lock the two tail joint threading caps to the specified position with 2 M4 * 10_ stainless steel flange hexagon screws on the tail side, torque: 1.5 ± 0.15NM |
| Use tools & fixtures | 1. Electric Batch 2. Torque Calibrator 3. Flight Platform Carrier Board |
| Operational special requirements | 1. No abnormal locking of the screwdriver 2. No leakage locking of the screwdriver 3. No abnormal torque 4. No abnormal installation direction |

| General requirements |
| 1. Operators must wear anti-static wrists and finger covers or gloves |
| 2. The workbench should always be kept clean and tidy |
| 3. If you find three similar abnormalities, please report to the production line administrator immediately |
| 4. Label the defective parts and place them in the designated defective product placement box |