P4: Upper Weighing Assembly
|
Product Name |
C31 |
Procedure |
P4 |
|
Workstation |
Upper Weighing Assembly |
Version |
A2 |
Products to use
| Name | Part number | Number | Description |
| 180 upper weighing induction plate thickening plate assembly | 755-000050 | 1 |
|
| M5 * 40 cup head stainless steel triple combination hexagonal machine tooth bolt _ whole circle resistant to falling | 126-001070 | 8 | 180 upper weighing components * 4 * 2 |
Work Instructions
| Step 1 | 1. Use 8 M5 * 40 cup head stainless steel triple combination hexagon machine tooth screws to lock the upper weighing component to the designated position _ left and _ right of the main beam as shown in the figure; torque: 5 ± 0.5N.m |
| Use tools & fixtures | 1. Electric Batch 2. Torque Calibrator |
| Operational special requirements | 1. Screwlock without leakage 2. Torque without abnormality 3. Screwlock without abnormality 4. Upper weighing wire harness faces the front crossbeam, consistent with the direction of the machine head 5. Upper weighing W2 corresponds to the main beam _ left front, upper weighing W1 corresponds to the main beam _ right front |

| General requirements |
| 1. Operators must wear anti-static wrists and finger covers or gloves |
| 2. The workbench should always be kept clean and tidy |
| 3. If you find three similar abnormalities, please report to the production line administrator immediately |
| 4. Label the unqualified parts and place them in the designated defective product placement box |