Skip to content
English
  • There are no suggestions because the search field is empty.

P4: Upper Weighing Assembly

Product Name

C31

Procedure

P4

Workstation

Upper Weighing Assembly

Version

A2

 

Products to use

Name Part number Number Description
180 upper weighing induction plate thickening plate assembly 755-000050 1

 

M5 * 40 cup head stainless steel triple combination hexagonal machine tooth bolt _ whole circle resistant to falling 126-001070 8 180 upper weighing components * 4 * 2

 

Work Instructions

Step 1 1. Use 8 M5 * 40 cup head stainless steel triple combination hexagon machine tooth screws to lock the upper weighing component to the designated position _ left and _ right of the main beam as shown in the figure; torque: 5 ± 0.5N.m
Use tools & fixtures 1. Electric Batch
2. Torque Calibrator
Operational special requirements 1. Screwlock without leakage
2. Torque without abnormality
3. Screwlock without abnormality
4. Upper weighing wire harness faces the front crossbeam, consistent with the direction of the machine head
5. Upper weighing W2 corresponds to the main beam _ left front, upper weighing W1 corresponds to the main beam _ right front

General requirements
1. Operators must wear anti-static wrists and finger covers or gloves
2. The workbench should always be kept clean and tidy
3. If you find three similar abnormalities, please report to the production line administrator immediately
4. Label the unqualified parts and place them in the designated defective product placement box