Skip to content
English
  • There are no suggestions because the search field is empty.

P5: Integrated Spray Tank assembly

Product Name

C31

Procedure

P5

Workstation

Integrated medicine box assembly

Version

A2

 

Products to use

Name Part number Number Description
180 Integrated Medicine Box Component 120L Edition 755-000055 1

 

HD5150 tripod tee cover 201-002495 1

 

M5 * 50 stainless steel flange inner hexagon machine tooth bolt _ whole circle resistant to falling 126-000966 1 Three-way outer cover * 1
M5 * 16 cup head stainless steel flange inner hexagon machine tooth bolt _ whole circle resistant to falling 126-000997 4 Three-way outer cover * 4
180 spray rod stand pre-installed pad block 201-002828 2

 

180 spray rod stand pre-installed screws 126-001071 2

 

Stopper 8-35-M6 chamfered hole 126-001146 2 Upper weighing medicine box connection bracket * 1 * 2
M6 anti-loosening nut 126-000914 2 Upper weighing medicine box connection bracket * 1 * 2
R-shaped pin elastic opening pin 126-000504 2

 

Federal GY-340 thread glue 131-000121

 

 

 

Work Instructions

Step 1 1. The medicine box is placed in the center, the tripod _ left, the tripod _ right are combined and assembled from both sides of the medicine box according to the figure, until the upper beam and the main beam _ right three through holes are inserted to the end;
Use tools & fixtures 1. Medicine box assembly fixture
Operational special requirements 1. The direction of the medicine box assembly is correct

Step 2 1. Use 1 M5 * 50 stainless steel flange inner hexagon machine tooth bolt to lock the tee outer cover and front crossbeam to the designated position _ left front of the tripod and lock it; torque: 1.5 ± 0.15N.m.
2. Then use 4 M5 * 16 cup head stainless steel flange hexagonal machine tooth bolts to lock and reinforce the outer cover of the tee and the front crossbeam; torque: 1.5 ± 0.51 N.m.
Use tools & fixtures 1. Electric batch
2. Torque calibrator
3. Medicine box assembly fixture
Operational special requirements 1. Screen without leakage lock
2. Torque without abnormality
3. Screen lock without abnormality

Step 3 1. Assemble the pre-installed spacer and pre-installed screwdriver together according to the diagram and requirements;
2. Use 2 pre-installed screwdriver assemblies to lock the rear lower crossbeam to the designated position _ left and _ right of the tripod as shown in the figure; Torque: 2 ± 0.2N.m
Use tools & fixtures 1. Electric batch
2. Torque calibrator
3. Medicine box assembly fixture
Operational special requirements 1. Pre-installed bolts/pre-installed pads without leakage lock
2. Torque without abnormality
3. Bolt lock without abnormality
4. Installation direction of pre-installed pads without error
5. Installation direction of rear lower beam without error
6. Thread glue without leakage coating

Step 4 1. Lock the shaft connecting plates of the upper weighing W1 and W2 and the connecting bracket of the upper weighing medicine box together with one plug-in screw8-35-M6 chamfered hole and one M6 anti-loosening nut; torque: 2.0 ± 0.2N.m
Insert the two R-shaped elastic opening pins into the designated position of the plug bolt head according to the diagram and insert them into place.
Use tools & fixtures 1. Electric Batch
2. Torque Calibrator
Operational special requirements 1. No leakage lock for bolts/nuts
2. No abnormal torque
3. No abnormal locking of bolts/nuts
4. No leakage of R-type pin elastic opening pin
5. No abnormal assembly of R-type pin elastic opening pin
6. Nut facing the head

General requirements
1. Operators must wear anti-static wrists and finger covers or gloves
2. The workbench should always be kept clean and tidy
3. If you find three similar abnormalities, please report to the production line administrator immediately
4. Label the unqualified parts and place them in the designated defective product placement box