Skip to content
English
  • There are no suggestions because the search field is empty.

P9: Spray Tank mask Assembly

Product Name

C31

Procedure

P9

Workstation

Spray Tank Cover Assembly

Version

A2

 

Products to use

Name Part number Number Description
150 power supply joint anti-fool parts 201-003045 1

 

M3 * 10_ stainless steel flanged hexagon screwdriver 126-000953 14 External centrifugal spraying * 2 * 2 + internal centrifugal spraying * 2 * 2 + upper weighing * 2 + searchlight * 2
15.8Mm line card 126-001073 6

 

M4 * 8_ stainless steel flat head inverted edge hexagon machine tooth bolt _ whole circle drop resistance 126-000770 11 Medicine box mask * 5 + line card * 1 * 6
M3 * 15_ stainless steel flange inner hexagon machine tooth bolt _ whole circle drop resistance 126-000744 2 Spray power supply bus * 2
180 medicine box mask 201-002833 1

 

White grease 131-000157

 

 

 

Work Instructions

Step 1 1. Insert a total of 6 plugs for internal centrifugal spraying, external centrifugal spraying, upper weighing, and searchlight into the designated socket of the control box assembly according to the diagram and press them into place;
2. Each plug is locked with 2 M3 * 10_ stainless steel flange hexagonal machine tooth screws and control box component shell; torque: 0.8 ± 0.08N.m
Use tools & fixtures 1. Electric Batch
2. Torque Calibrator
Operational special requirements 1. Screen without leakage lock
2. Torque without abnormality
3. Screen lock without abnormality
4. Plug without leakage, installation position without error

Step 2 Hold the centrifugal nozzle harness with a 15.8mm wire card, and then lock the wire card to the designated position of the medicine box with M4 * 8_ stainless steel large flat head inverted hexagonal machine tooth screws; torque: 0.8 ± 0.08N.m
Use tools & fixtures 1. Electric Batch
2. Torque Calibrator
Operational special requirements 1. No leakage lock for the screwdriver
2. No abnormal torque
3. No abnormal locking for the screwdriver
4. No abnormal locking position and direction for the wire card

Step 3 1. Use 2 M3 * 15_ stainless steel flange hexagonal machine tooth screws to lock the power supply bus plug and power supply joint anti-fool parts according to the figure and lock them at the designated position of the upper and lower connector fixing seat; torque: 0.6 ± 0.06N.m.
2. Snap the spray control bus plug into the designated wire buckle position of the corresponding upper and lower connector fixing seat according to the diagram;
Use tools & fixtures 1. Electric Batch
2. Torque Calibrator
Operational special requirements 1. Screen without leakage lock
2. Torque without abnormality
3. Screen lock without abnormality
4. Spray power supply bus plug line card facing outward

Step 4 1. Lock the medicine box mask to the designated position of the medicine box according to the diagram with 5 M4 * 8_ stainless steel flat head inverted hexagonal machine tooth screws; torque: 0.8 ± 0.08N.m
Use tools & fixtures 1. Electric Batch
2. Torque Calibrator
Operational special requirements 1. No leakage lock for the screwdriver
2. No abnormal torque
3. No abnormal locking for the screwdriver
4. All wire harnesses are inside the mask, with no wire pressure

 

General requirements
1. Operators must wear anti-static wrists and finger covers or gloves
2. The workbench should always be kept clean and tidy
3. If you find three similar abnormalities, please report to the production line administrator immediately
4. Label the unqualified parts and place them in the designated defective product placement box